Ground, flood, drainage, water, access and structure checked before a site is bought or a design fixed, with abnormal costs named.

A site is priced on the assumption that it can be founded, drained, serviced and reached at a normal cost. A feasibility study tests that assumption before the money is committed, and names the abnormals that would change the price.

The architect tests what planning will allow on a site. The engineer tests whether it can be built, drained, accessed and serviced, and what that costs. Both answers are needed before a site is bought, and they are cheapest to get together.

We specify the site investigation and read it, screen the flood risk, find the outfall, start the Uisce Éireann enquiry and check the access. For an existing building we check whether it can take an extra storey, a change of use or new openings. The result is a list of abnormals a quantity surveyor can price.

What we check

Ground

A desk study of the maps and nearby boreholes, then the site investigation it calls for, read for what it means for the foundations.

Flood risk

A Stage 1 screening against the maps and the county , and a plain answer on whether a fuller assessment is needed.

Drainage outfall

Where surface water and foul can go, by gravity or pumped, and how much of the site attenuation will take.

Water and wastewater capacity

An Uisce Éireann pre connection enquiry started early, since the answer takes months.

Access

Sightlines, the junction onto the public road and swept paths, to or standards.

Existing buildings

Whether the walls, slabs and foundations can take an extra storey, a change of use or new openings.

Structural options

Frame type, grid, and precast or in situ, chosen while the layout can still follow.

Abnormal costs

Piling, made ground, pumping, retaining walls, network upgrades and diversions, listed for the quantity surveyor to price.

What each check can turn up

Each of these is a cost a normal price does not include. Found before the site is bought, it is a line in the negotiation; found after, it comes out of the margin.

CheckWhat it can findWhat that costs
GroundMade ground, soft alluvium or peatPiles or a raft instead of strip foundations, and the cost of disposing of what is dug out.
FloodLand in or beside Flood Zone A or BRaised floor levels, compensatory storage, or a use the site cannot take.
DrainageNo gravity outfall within reachA pumping station, a long outfall, or more of the site given to attenuation.
Water and wastewaterA network without the capacityUpgrades the development has to fund, and months added to the programme.
AccessSightlines the entrance cannot achieveJunction works, land from a neighbour, or a different entrance.
Existing structureWalls or foundations already at their limitStrengthening, new foundations, or a smaller scheme.
RadonA High Radon Area on the EPA mapA radon barrier as well as the standby sump: a cost line rather than a reason to walk away.

What you receive

Each finding with what it means for the price and the programme.

  • A report on each check, with the risks ranked
  • A list of abnormal costs for the quantity surveyor to price, or for the land negotiation
  • The site investigation specification, and the results read for the foundations
  • The flood risk screening, and whether a fuller assessment is needed
  • The Uisce Éireann pre connection enquiry, submitted
  • For an existing building, what it can take and what would have to change
  • The surveys still needed, and the order to commission them in