Frame, grid, foundations and precast reviewed for the same building at less cost, with every alternative designed and signed for.

Value engineering is going back through a design to get the same building for less: a different structural system, a simpler grid, less material in the same member. It is not deleting things until the number fits.

What is never traded is what the building has to do: fire resistance, durability, robustness, and a design that can be certified. An option that touches any of those is not an option.

We review our own frames and schemes drawn by other engineers, for developers, contractors and design teams. When an alternative is taken we design it, carry it into the drawings and sign for it, including the ancillary certificate. Turning an in situ or steel scheme into precast is a large part of that work, and where precast will not pay we say so.

What we look at

Frame and stability system

Precast, in situ, steel or a hybrid, chosen for the building rather than by habit, with the stability system that suits it.

Grid, spans and floors

A grid that repeats, spans the floor type carries economically, and floor depths that take the services without growing the building.

Transfer structures

Where the layout above does not line up with the layout below, the transfer is reworked or designed out before it is priced.

Foundations

Pads, strips, rafts or piles chosen from the ground information, and existing slabs reused where they can take the new load.

Precast repetition

Fewer unit types and moulds, connections that repeat, and a scheme fixed early enough for precast to pay.

Steel and reinforcement

Tonnage and rebar weighed against connection and fixing cost, since the lightest member is not always the cheapest one.

Buildability and sequence

Crane reach, lift weights, access and erection order, so the saving on paper survives the site.

Programme

What each option does to the time on site, priced alongside what it does to the materials.

When it pays

The earlier a review happens, the more of the design can still move and the less a change costs to make. Late in the job most of the value has already been spent.

When a change is cheapest
  • What can still change
  • What a change costs
  1. Concept
  2. Planning
  3. Tender
  4. Construction

Schematic, not measured: the long established shape of a design's life, where the freedom to change it falls and the cost of changing it rises as the work goes on.

StageWhat can still changeWhat it is worth
ConceptWhere it pays mostFrame type, grid, spans and floorsThe most. Nothing is drawn in detail that a change has to undo.
PlanningWhere it pays mostMember sizes, floors, foundations, precast or in situA great deal, inside the envelope the permission allows.
TenderSizes, connections, foundations and sequenceStill worth it on a scheme that has come in over budget, priced against the cost of redrawing.
ConstructionDetails, sequence and temporary worksRarely much. Anything ordered or cast is fixed, and a late change often costs more than it saves.

What you receive

A review ends in decisions that can be priced, not a list of ideas.

  • An options note comparing each alternative on cost, programme, risk and what it changes in the design
  • Member sizes and marked up drawings for every option worth pricing
  • Quantities the quantity surveyor or the contractor can price against
  • A clear statement of who carries design responsibility for each change
  • The chosen option carried into the structural drawings and calculations
  • The ancillary certificate for the redesigned elements, where the job is under