
Site Investigations: What the Ground Decides
The frame gets the attention and the ground writes the cheque: what a site investigation saves, and three ground conditions that change a foundation here.
What we end up explaining on the phone, written down once: when a job needs an engineer, who signs what under the building regulations, and what a precast frame is actually buying you.

The frame gets the attention and the ground writes the cheque: what a site investigation saves, and three ground conditions that change a foundation here.

Most of the calls this office takes are about a wall somebody wants to open up. Here is how to tell whether that wall is holding the house up, and what it costs to find out.

Design Certifier and Assigned Certifier are two different appointments under the building regulations, and they get used as though they were one. The difference decides who is on the hook for what.

Precast is sold on speed, the least interesting part of it. What it buys is a dry floor to work off and a programme that stops depending on the weather.

Ireland's record €275 billion National Development Plan runs to 2035 and its projects are stuck. What has to change for the money to become building.

Housing, transport and infrastructure are being built at once, and the engineering under them has changed more than the skyline has. Three things define the job in Ireland now, and the calculation is none of them.
Drawings, a specification, or the site address and the programme dates: whatever you have is enough to start. We come back inside two working days, and a written fee proposal against a defined scope follows within three working days of that.