Structural Calculations
Load bearing walls taken out, extensions and attic conversions, with a site visit and a fixed fee quoted first.
Read moreStructural Engineers in Kildare
Structural and civil engineering for homes and housing schemes in Maynooth and its environs, from our office in Newbridge, about half an hour away.
Maynooth is a university town and one of the two Key Towns in the county, growing on both sides of the boundary with Meath. The office is in Newbridge, about half an hour away, and the engineer who visits is the one who designs the job and signs for it.
We take on extensions, openings, surveys and certification for homeowners in the town, and the roads, drainage and Uisce Éireann connections a housing scheme needs to be built and taken in charge.
Kildare County Council is the planning authority and the building control authority, at Áras Chill Dara on Devoy Park in Naas, and commencement notices are lodged with it through the national Building Control Management System. Maynooth is in the Clane-Maynooth Municipal District.
Since 1 April 2025 the town has been planned under the Maynooth and Environs Joint Local Area Plan 2025 to 2031, made by Kildare and Meath County Councils together, because the town's environs run across the county boundary. A site on the Meath side is a Meath application, with Meath County Council as its planning and building control authority, even though the plan it is read against is the same one.
The Lyreen River runs through the town, and a flood relief scheme for Maynooth is in the Office of Public Works. The state body that leads flood risk management in Ireland, and publishes the national flood maps on floodinfo.ie.'s Flood Risk Management Plans. Until it is built the maps on floodinfo.ie are the starting point, and a site near the river will be asked about flood risk at planning.
Most of the new building in and around Maynooth is housing, and on a scheme the civil engineering is what decides whether the roads, drains and water mains are taken in charge at the end. We design them to the council's standards from the start, and make the Uisce Éireann applications as your agent, so the handover is not a negotiation.
Drawings, a specification, or the site address and the programme dates: whatever you have is enough to start. We come back inside two working days, and a written fee proposal against a defined scope follows within three working days of that.