What precast concrete is, what it is made of, how it is made and where it is used, explained by an Irish practice that designs precast frames all week.

Precast concrete is concrete that is cast into a mould and cured in a controlled factory environment, then transported to site as a finished element and lifted into place. Walls, floors, beams, columns and stairs are made this way, reinforced with steel bars or prestressed with steel strand, and connected on site to form the structure.
The alternative is concrete cast in situ, poured into formwork where it will stay. Most Irish buildings use some of both, and the question on a real job is which parts go which way. That comparison has its own piece. This one covers what precast is, how it is made, the elements it comes in and when it is the right answer, from an office that designs precast frames for manufacturers and contractors every week.

The same ingredients as any structural concrete. What changes is how tightly they are controlled.
Every element is drawn before it is cast, which is the real difference from in situ work: the engineering, the openings and the connections are settled on paper first. The production itself runs in a fixed order.


Seven families cover most of what leaves an Irish precast yard. Each is an answer to the same question: what is this part of the building being asked to carry.
Hollowcore slabs are prestressed planks with voids running their length. Standard units are 1200mm wide, typically 150mm to 400mm deep, and span well past ten metres; The Concrete Centre cites a 16 metre span for office loading. The voids take weight out of the floor and can carry services. Hollowcore went into every block at Santry, with a structural screed over it to tie the floor together.

Filigree and wideslab units are thin precast plates with steel lattice girders standing out of the top. They are lifted onto the walls, propped, and a structural topping is cast over them, so the plate becomes the permanent formwork and the bottom of a solid floor. At the Tonlegee Road nursing home the floors are 100mm wideslab units with a 125mm screed, dropped by 75mm at the en suites so the wet rooms finish flush.
Solid slabs are cast to full depth in the factory, used where a floor is short, heavily loaded or needs no topping.
Solid walls are cast to full thickness and carry load, provide stability as shear walls, or both. In a crosswall frame, the walls between rooms are the structure: they carry the floors and hold the building against wind, which is why hotels, student housing and apartments, all built of repeated cells, suit it so well. The Hotel at Goffs is a three storey example, on precast crosswalls with filigree floors.

Twin wall is two thin precast skins held apart by steel lattice girders. The panel is light to lift, and once it is stood and propped the cavity is filled with concrete on site, so the finished wall behaves as one solid reinforced wall. It is the usual choice for basements, water retaining structures and walls that need continuity with what is around them.
Insulated sandwich panels carry an outer skin, a layer of insulation and an inner structural skin, so the façade, the thermal line and the structure arrive as one element. The external walls at 73 North Wall Quay are of this kind: a twin wall with insulation and an in situ concrete core.
Architectural panels are cladding: brick faced, polished, acid etched or textured, hung off the frame rather than carrying it.
Columns take load from beams and floors down to the foundations, and can run several storeys in one piece with corbels cast on to carry the beams. Beams come as rectangular, inverted tee and L shaped ledge beams, whose nib carries the floor units. Double tees are the long span option, used mainly in car parks. Sunderland Royal Hospital car park is this kind of frame: multistorey columns, spine and spandrel beams and screeded hollowcore, braced by precast stair cores and solid walls.


A stair flight is cast in one piece, treads and risers together, often with its landings. Craned in as the floors go up, it gives the site a finished stair from day one rather than a temporary one.

Precast piles, pad foundations, retaining walls, culverts, tanks and bridge beams follow the same logic outside buildings. At Seatown Lane a precast deck kept the work off the road and out of the channel, and on the Kerry Central Regional Water Supply Scheme we provided the engineering on the precast elements.
A pile of well made elements is not yet a building. Precast works when the connections make the pieces act together, and that is where most of the engineering goes.
The Holiday Inn at Dublin Airport shows the whole chain: precast shear walls take the wind, propping holds the frame through erection, and once the screeded deck is complete the floor acts as a diaphragm. The joint between the precast and whatever else is on the job matters as much. At Horgan's Quay, two eleven storey blocks with more than 2,000 precast wall and header units, the precast stands against an in situ structure by another design team, and the load transfer and connections were agreed drawing by drawing.
The honest summary: precast pays on repetition and programme. When the building is small, nothing about it repeats, or the design is still moving, in situ is usually the better answer, and we will say so.
It can be, and the case rests on efficiency rather than on the material being green. Cement is the carbon heavy ingredient, and precast lets that be managed tightly: mixes designed to the element, cement replaced with GGBS, steel moulds reused hundreds of times, and offcuts and returned concrete recycled in the yard. Hollowcore and filigree floors use less concrete than an equivalent solid slab. Precast also leaves less waste on site, and elements can in principle be taken down and reused. What it does not do is make concrete low carbon by itself: the mix still decides most of the embodied carbon, which is why manufacturers now publish environmental product declarations. The wider picture is in decarbonisation and carbon accounting in Irish construction.
Precast is the part of our work we are best known for. We design and detail precast frames from the foundations to the roof, modelled in Allplan Precast and analysed in SCIA Engineer, for manufacturers and contractors anywhere in Ireland. If you are weighing it on a project, the precast concrete page sets out how we work.

Ireland's construction sector in 2025 faces housing delivery falling short of targets, a labour shortage, and rising costs. Here's how innovation and the PETRUF approach help address these challenges.

Construction projects move through several key phases, each requiring expert input. Consulting engineers are essential at every stage, ensuring quality, safety, and compliance.
Drawings, a specification, or the site address and the programme dates: whatever you have is enough to start. We come back inside two working days, and a written fee proposal against a defined scope follows within three working days of that.