BIM is how a project's information is created, shared and kept, not a software package. Its meaning, levels, dimensions, ISO 19650 and the Irish mandate.

Building Information Modelling (BIM) is the use of a shared digital representation of a built asset to support design, construction and operation, and to give a reliable basis for decisions. That is how ISO 19650 defines it. In practice it means a structured, coordinated model and its data that the whole team works from.
BIM stands for Building Information Modelling, spelt "modeling" in American English. The word that matters is information. A BIM model is not just a picture of a building. Each element knows what it is, what it is made of, where it sits and how it relates to what it touches.
"Building" is wider than it sounds: ISO 19650 says "built asset", which covers bridges, roads and water infrastructure as well as buildings. Some read the M as management, and the standard backs them, since it is titled as information management using building information modelling.
No. BIM is a process, and software supports it. Revit, Allplan, Tekla, ArchiCAD and similar packages are tools for authoring models. Owning one does not mean a project is doing BIM. The UK BIM Framework guidance makes the point bluntly: a client who simply asks for "a BIM project" will not meet the requirements of ISO 19650, and a shared drive is not a common data environment.
CAD (computer aided design) draws lines, arcs and text: a digital drawing board. A wall in CAD is two parallel lines, and a section through it is drawn again by hand. In BIM the wall is an object with a type, a thickness, a material and a fire rating. Plans, sections, schedules and quantities are all views of that one object, so a change made once appears everywhere. On its own, CAD is Level 0 or Level 1 on the maturity ladder below.
Our own BIM work covers all six. The structural model carries the elements, the reinforcement, the connections and the services that pass through them. We federate it with the other disciplines' models for clash checks, take bills of quantities, reinforced concrete drawings, bar bending schedules and CNC production files for precast elements out of it, link it to the programme, and hand over the asset information the owner needs to run the building. How that plays out on a precast job is in BIM implementation in precast concrete.
The BIM levels describe how mature a team's information management is, from paper to a fully shared model. They come from the UK, where the 2011 Government Construction Strategy set Level 2 as the target for centrally procured projects by 2016.
ISO 19650 parts 1 and 2 grew out of the British standards BS 1192 and PAS 1192-2, which defined Level 2. The ISO dropped the numbering. What used to be called Level 2 is now "BIM according to the ISO 19650 series", which the UK guidance also calls Stage 2. It is mostly Level 2 with some elements of Level 1 and Level 3. In 2019 the UK replaced "BIM Level 2" with the UK BIM Framework, built on ISO 19650. The guidance adds a warning: there is no legal definition of "BIM according to ISO 19650", so a contract that only asks for it, without saying what information is needed, is asking for very little.
ISO 19650 is the international standard series for managing information over the whole life of a built asset using BIM. Ireland adopted it as I.S. EN ISO 19650 through the National Standards Authority of Ireland (NSAI). It has six parts:
In 2021 NSAI published an Irish National Annex to Part 2, NA:2021 to I.S. EN ISO 19650-2:2018, which sets out how to apply Part 2 on Irish projects, including the naming of files and other information containers. Parts 1 to 3 are under revision at ISO, with a new edition expected around 2027, but the 2018 editions are the ones in force.
Requirements flow down from the appointing party. Each lead appointed party answers them with its BEP and passes the relevant parts on to its task teams. Information flows back up through the CDE, checked at each step, until it is accepted by the client. Older PAS 1192 material calls the same roles employer and supplier.
The dimensions are shorthand for the kinds of information a model carries beyond its geometry.
Above 5D, sources disagree
Be careful with 6D and 7D. There is no agreed definition beyond 5D. Most software vendors and training providers use the order above, but NBS and Designing Buildings put facilities management at 6D and sustainability at 7D. NBS points out that the dimensions are not used in the international standards at all, and that it is better to state exactly which information is required. ISO 19650 does that through the AIR and the EIR. If a brief asks for "6D BIM", ask what it means by it.
On public works, yes, and the threshold is falling in stages. The government set out its BIM strategy in November 2017. The adoption timeline under the Capital Works Management Framework (CWMF) phases BIM in by project value, with design teams first and contractors and the supply chain six months later:
| Project value | Design teams | Contractors and supply chain |
|---|---|---|
| Over €100m | 1 January 2024 | 1 January 2025 |
| Over €20m | 1 January 2025 | 1 July 2025 |
| Over €10m | 1 July 2025 | 1 January 2026 |
| Over €5m | 1 July 2026 | 1 January 2027 |
| Over €1m | 1 January 2027 | 1 July 2027 |
| Under €1m | 1 July 2027 | 1 January 2028 |
The requirement applies to projects that begin CWMF Stage 1 on or after each date, not to projects already under way, and the timeline is subject to review. Where BIM is required, the CWMF names four core standards: the ISO 19650 series, Uniclass for classification, IFC as the open file format, and the International Cost Management Standard (ICMS) for costs and carbon. Private clients are not bound by the mandate, but many now ask for the same thing.
The benefits depend on the client stating what it needs. A model built without requirements is only an expensive drawing. With clear requirements, BIM does what it promises: the right information, to the right people, at the right time.

The frame gets the attention and the ground writes the cheque: what a site investigation saves, and three ground conditions that change a foundation here.

Most of the calls this office takes are about a wall somebody wants to open up. Here is how to tell whether that wall is holding the house up, and what it costs to find out.
Drawings, a specification, or the site address and the programme dates: whatever you have is enough to start. We come back inside two working days, and a written fee proposal against a defined scope follows within three working days of that.